2026 NEC publication context

NEC service and feeder load calculations

Article 220 covers branch-circuit, feeder, and service load calculations. A contractor or designer uses the applicable calculation method with the loads and conditions at the property.

Why a service or feeder decision needs an Article 220 load calculation rather than a calculator result alone.

Planning reference only. Power Totals is not an electrical contractor, engineering firm, inspection service, permit authority, or code-book substitute. Code adoption and amendments vary. Confirm the adopted edition and project requirements with the authority having jurisdiction.

What to confirm for the job

  • Which Article 220 calculation method applies to this property?
  • Which existing and proposed loads were included?
  • Does the permit authority require a load-calculation worksheet with the application?

Official sources

Local permit contacts

The current dataset does not contain sourced state-by-state NEC adoption records. These links go only to states where Power Totals has at least one checked local permit-authority link.

Other code topics

Incentive updates

Get notified when solar incentives change in your state.

One confirmation email is required before updates begin. Unsubscribe from any message.